
Tweener Premium
For clubs and academies: over 300 lux on the playing area, uniformity above 0.7. Compliant with FFT, ITF, EN 12193, USTA and AUS/NZ.
- 16 LED bars of 3.80 m
- 4 LED bars of 1.90 m
- Mounting accessories
- 2 power cabinets
- Installation guide

The mastless linear LED system for your outdoor courts. FFT compliant, installed in 6 hours, no building permit required.
Thanks to its linear LED bar system that attaches directly to the fence posts on each side of the court, Tweener has every advantage needed to become the benchmark.
Thanks to its innovations, Tweener has become the benchmark for many private and public clubs, tennis academies, hotels and holiday clubs, as well as private owners.

Three configurations depending on your level of play and number of courts.

For clubs and academies: over 300 lux on the playing area, uniformity above 0.7. Compliant with FFT, ITF, EN 12193, USTA and AUS/NZ.

The highest illuminance level in the range: over 400 lux on the playing area, uniformity above 0.7. Compliant with LTA, FFT, ITF, EN 12193, USTA, AUS/NZ and SLG.

To light two adjacent courts within the same enclosure with a single installation: over 400 lux on the playing area, uniformity above 0.65.
A wall, partial fencing, non-standard posts or a large court: our design office creates custom mountings. Based on your technical documents and a few photos, we analyse the exact configuration of your installation.
Our engineers then develop a dedicated mounting solution that guarantees the mechanical stability of the installation while preserving the uniformity of the lighting. You receive a reliable, ready-to-install adaptation system, designed to meet the technical requirements of your environment.
See our specific projects
A single point of contact, from the study of your site to the commissioning of the lighting.
Analysis of your site from plans and photos, photometric study and quote within 48 hours.
Manufactured in France on our own assembly line, configured for your site.
A single 230 kg crate delivered on site, with the installation guide.
6 hours with 2 people on the existing fence, without crane or concrete.
Connection by a qualified electrician and adjustment of the control system.
Get your personalized quote within 48 hours, with no commitment.